Millwork 101

Millwork Tips and Tricks 101 

A practical guide to clearer details, better coordination, and fewer surprises 

Millwork can be one of the most rewarding parts of a project. The difference between a smooth shop-drawing review process and a painful one often comes down to how clearly the design intent was documented from the start. 

The Goal is to understand: 

  • When a custom millwork section is required 
  • When an existing standard detail is sufficient 
  • When a standard detail needs to be modified to align with the design intent 

Clear decisions here help avoid misinterpretation, costly revisions, and shop drawings that don’t align with the design. 

The Importance of Sequencing: Think Long Game 

Millwork doesn’t exist in isolation—it lives alongside furniture, appliances, power, and data. 

Think of the millwork details within shop drawings as a step-by-step instruction manual—it explains exactly how the piece is assembled, whether standard or customized. 

If a condition is not detailed in your drawing set, the millworker won’t have a section, detail, or elevation to reference which often means they will fill in the gaps themselves—and sometimes incorrectly. 

Best practices: 

  • Minimize assumptions left to the millworker to try and interpret on their own.  
  • During shop drawing review, treat any inconsistency between your details and theirs as a red flag and investigate further.   
  • If there isn’t a 1:1 relationship between your drawings and the shop drawings, pause and verify that all conditions are fully coordinated.

Countertop Materials and Thicknesses 

Countertop selections dramatically affect millwork sections, so accuracy matters. 

3 cm quartz 

  • Should be shown as a solid 1-1/2” slab 
  • No mitered or returned edge condition is required here unless your project specific design intent calls for it.  

2 cm quartz 

  • Thinner overall and requires either a mitered edge condition, or a built-up edge condition 

Acrylic solid surface  

  • Available in various thicknesses 
  • Ensure the specified thickness is represented accurately in millwork sections 

Plastic laminate (PLAM) 

  • Typically has an eased or rolled edge 
  • Installed over a thinner substrate with MDF built-up core elements 
    • When backsplashes or side splashes are specified make sure to show them clearly and consider dashed lines with a note to “Refer to Elevation” when multiple conditions exist 

Toe Kicks: Don’t Leave This Vague 

Toe kicks are often overlooked, but they carry both visual and material implications. 

Too often they’re assumed to be rubber base, labeled generically in elevation as “scheduled base” or not actually scheduled anywhere at all. 

There are two clear ways to handle toe kicks correctly: 

  1. Call It Out in the Detail
  • If you’re referencing an existing standard millwork detail, explicitly note the toe kick condition or conditions. 
  1. Call It Out in Elevations
  • Clearly label toe kick materials in elevation views. 
  • Do not leave this open to interpretation. 

Additional coordination tips: 

  • If the millwork includes wood grain, show grain direction in elevations and ensure to specify that the toe kick grain runs in the same direction as the vertical face of your cabinet door.  

Coordinating Drawing Elements with Furniture, Equipment and Electrical   

When developing millwork details within construction documents, it’s critical to think ahead to the moment you set the finished millwork in place.  Will the specified microwave fit within the cabinetry opening provided?  Is that coffee maker too tall to fit underneath the upper cabinet?  Is there power and data above the counter for the printer?  These are all critical elements to plan ahead for and fully coordinate within the construction documents. 

  • Mounting heights for outlets must be shown within the document set and coordinated with millwork details, counter heights and any equipment being installed within the millwork.  These heights often get missed or don’t align with millwork elevations—double-check coordination 
  • Draw every aspect of millwork to scale—including countertops—to ensure clear coordination.  This will allow the designer to accurately lay out any undercounter equipment or furniture to ensure the layout is viable.  Power and data requirements can be coordinated at this time to align with the planned equipment.  

Additional Review Tips and Best Practices 

  • Start with the standard detail library already loaded in the Revit template 
  • Modify as needed rather than reinventing details 
  • Use available residential and commercial detail resources for more unique conditions 
  • Line weights matter: thicker lines for cut elements, thinner lines for elements beyond 
  • Use dashed lines to show items beyond or furniture shown for reference in elevations and details 

Final Thought 

Good millwork documentation is about clarity, foresight, and coordination. The more intentional the details are upfront, the smoother the shop drawing process—and the closer the finished product will be to the design intent. 

When in doubt, draw it, label it, and don’t leave it to interpretation. 

Related Articles

Styling a Bookcase

Styling a Bookcase: A Designer’s Approach  A thoughtfully styled bookcase does more than store books—it enhances the architecture of a space and reflects the people who live or work there. Whether incorporated into a corporate or multifamily application,...

DriveCentric – Corporate Design Project

DriveCentric – Corporate Design Project: Technology Integration & Workplace Culture Founded in May 2010, DriveCentric, as a company, strives to use rapidly evolving technology to deliver a cutting-edge suite of products to car dealerships. Using modern tools to...

Post COVID-19 Workplace Design

Post COVID-19 Workplace Design Solutions Remiger Design is taking necessary precautions to ensure the health, safety and welfare of our staff, clients, and consultants. As always, we remain available and willing to help in any way that we can. Our team has been...

The Gateway Arch Universal Design

A key design factor in the Gateway Arch renovation was inclusiveness. Designers and people with disabilities teamed up to make sure the new renovation would be welcoming to all visitors.  Learn first-hand about what Universal Design means by watching The...

History of the ADA

July 2020 Crip Camp: A Disability Revolution is a Netflix documentary about a group of teen campers who were inspired to join the fight for disability civil rights. Camp Jened was a summer camp for people with disabilities in the state of New York that became...

Fitwel.

FITWEL. “Building health for all®” – a mission statement that now is more essential than ever.  As the COVID-19 pandemic spread globally, the design industry, real estate professionals and business decision makers quickly took action to implement policies and...

St. Louis Science Center OMNIMAX Theater Renovation

We’re excited to have collaborated with the Saint Louis Science Center on renovations to their OMNIMAX® Theater, which re-opens Friday, November 29th with the featured film of Frozen 2. Check out the link to see what features this new space...

What is Agile?

Agile Definition Adjective Able to move quickly and easilyRelating to or denoting a method of project management, used specially for software development, that is characterized by the division of tasks into short phases of work and frequent reassessment and...

Benefits of Plants Beyond Visual Appeal

Written By: AshLee Snyder  |  February 2019 Modern buildings are heavily insulated for energy efficiency which leads to a reduction in fresh air exchange rates. Left unabated, the off-gassing of interior finishes and furnishings can cause unacceptable...

Rated E for Everyone

Written By: Lindsey Buening | November 2018 As a designer, I spend a lot of time thinking about my audience before a presentation or considering an end user’s experience in a space that is not yet built.  Using my imagination to think about how other people...

Subscribe to our Newsletter

Name(Required)